 |
 |
Centaur Products News
 |
Gallagher Centre in Yorkton Saskatchewan.
May 21, 2005
Completed in May, 2005. Centaur Products supplied and installed 32,000 sf of Pulastic 2000 Synthetic flooring). Centaur also supplied and installed 8 Jaypro electric fold up curtains, to provide a perimeter and physical barrier around the soccer pitch. A running track on the same level, but outside of the soccer pitch, provides athletes with more flexibility. Lastly, Centaur supplied and installed Southern Bleacher Seating for several hundred people upstairs on the mezzanine level.
|
|
|
|
|
 |
|
|