|
INSTALL A COVER...
With the cover loaded on COVERMATE II™, just move it
into place at one end of the gym or court and engage
the foot operated locking brake.
Next, pull a cover section off its roller by walking it over
to the other end of the gym while overlapping each
section. Repeat the process for each cover section.
Finish installation by taping all overlaps. |
|
REMOVE A COVER...
After attaching a cover section to a roller using the
QuickClips™, wind it back up on COVERMATE II™ with the
supplied hand cranks.
The optional OWERMATE™ power winder can make
this easy job even easier. |
|
SWEEP A COVER...
With COVERMATE II™ locked in place, just slide a cover
section through the optional, patented ULTIMA SERIES
COVERCLEAN™ brush assembly and attach it to a roller
with the patented, push-on QuickClips™.
While you wind up the cover, dust and debris are swept
from both sides of the cover simultaneously.
Only COVERMASTER offers a dual brush assembly. |
|
STORE A COVER...
With all cover sections back on their rollers, the
COVERMATE II™ storage system is easily wheeled into
any convenient storage area, ready for the next event. |